Robbie Thompson at Red Bud Factory

“Our new Red Bud coil line has arrived into Birmingham and should be operation in several weeks. Capable of 14 ga Galvanized, this line will run 275 ft per minute, handle coil weights of up to 50,000 lbs, breakdown and recoil larger coils into smaller ones. It’s drop stacker and stacking table will allow us the best presentation of stacked sheets available.”